Demonstration of hydropower technologies for efficient and forward-looking refurbishment of existing hydropower plants
European Commission
About
Opens for applications on 2027-08-04. A European Commission call for proposals. Expected Outcome: For a renewables-based electricity system sufficient flexible and also in the long-run fully sustainable hydropower capacity is pivotal. Project results are expected to contribute to all of the following expected outcomes: Enhancing the capacities of the hydropower fleet to contribute with variable renewables base load to a secure and stable electricity system, including by modernising grid integration and hydropower fleet control. Increase technology leadership, competitiveness and technology export potential of European hydropower industry. Address challenges of climate change adaptation for a forward-looking and stable operation of sustainable hydropower for the coming decades. Scope: Demonstration of hydropower technology solutions which allow for efficient and forward-looking refurbishment of existing hydropower plants. Provided solutions must be socioeconomically and environmentally sustainable (including biodiversity) and provide a respective assessment. Issues which can be addressed are for example: Innovative design of turbines (and also draft tubes, nozzles and distributors) and generators, including innovative improvements based on future load cycles an
Who can apply
Usually organisations in EU member states and associated countries, often in a consortium. Some calls are open to partners from other countries. Check the call conditions.
Best for
- Researchers
- NGOs
- Founders
- Location
- Europe
- Cost
- Free to apply
- Organizer
- European Commission
- 43108390
- eu funding